|
|
![]() ![]() ![]() |
|
|
|
Lessons
Learned
ANSR-1, May 12, 2001 This was the first flight of the camera control system. Unfortunately, we were unable to utilize the system because of an interconnect problem (broken wire). As a result, a checklist was developed to verify the operation of all the systems before release.
|
|
Copyright © 2001-2008, KD7LMO |
|
Web space provided by ESS, Inc. for all your consulting needs. |